UETM expands the geography of supplies of domestic outdoor installation GIS to the
In March 2023, the first RUEN-UETM-110 cell in Primorsky Krai was installed at a substation located in the suburbs of
This delivery was carried out as part of the expansion and modernization of the existing substation and significantly increased the reliability of energy supply to important infrastructure facilities.
RUEN-UETM-110 is a hybrid solution that significantly reduces the area occupied by the primary equipment of the substation. At the same time, one of the main advantages of the RUEN over the classic GIS is the ability to quickly bring any of the cells into service or repair, which ensures reliable power supply to the consumer and simplifies the work during the phased reconstruction of the substation.
RUEN-UETM-110 is more than compact with high maintainability.
When creating the switchgear, all the many years of positive experience in the development, production and operation of high-voltage UETM equipment was taken into account.
In operation, RUEN-UETM-110 has a number of advantages:
- The modular design of the switchgear allows you to implement any substation schemes
- High factory readiness, simple and fast installation
- There is no need to carry out any repairs, routine maintenance work is reduced to simple checks of the condition of the equipment.
- The current transformers built into the RUEN have a large calibration interval of 20 years.
- High seismic stability and the ability to withstand an earthquake up to 9 points on the MSK-64 scale.
- The possibility of installation at an altitude of up to