UETM supplies high-voltage equipment for the branch of PJSC FGC UES-MES of the East. The VEB-UETM-110 switch will be shipped as part of the construction of the 220 kV Yuktali-Khani power transmission line with soldering to the 220 kV Olekma substation and reconstruction of the 220 kV Yuktali substation.
Four VEB-110 switches will be shipped for the needs of the Magadan electric grid economy – the equipment will be installed at the 220 kV Berelekh and 110/35/6 kV Olskaya substations.